EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
Cozy4
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (261)
C01 Introduction
- (6)
-
Why Cozy & Progress
-
Project Selection
-
Plans - Modifications
-
Plans - purchase,...
-
Project Purchase
C02 Workshop
- (12)
-
shuffling everything
-
more work shop prep...
-
Build New Office
-
New Epoxy hot box
-
Purchase add'l tools
-
Prepare New Build Site
-
Identify New Build Site
-
Build New Jig Tables
-
Epoxy hot box
-
Fabric Cupboard
-
shop fixtures
-
New FL home
C03 Training
- (4)
-
PK training
-
Plans Review
-
Test layup #2 -...
-
Test layup #1 - flat...
C04 Fuse BH's
- (5)
-
Front Seatback
-
Forward Bulkheads
-
Instrument Panel
-
Main Gear Bulkheads
-
Firewall
C05 Fus Side
- (6)
-
Completion of Sides
-
Lower Longeron...
-
Inside Layup and...
-
Contouring Insides
-
Side Forms and Prep
-
Cutting Jigs and...
C06 Fse Assb
- (5)
-
Fuel Valve, Pump and...
-
Contouring and...
-
Center Keel and...
-
Assembly of Sides
-
moving through space...
C07 Fuse Ext
- (6)
-
Glassing the Sides
-
Contouring the Sides
-
Glassing the Bottom
-
Contouring the Bottom
-
Install Antennae
-
NACA Scoop
C08 Misc Int
C09 Lnd Gear
- (22)
-
Main Gear - building...
-
fairings, gear leg...
-
brake lines
-
change brake lines...
-
Spats - wheel pant...
-
Pants
-
Brake - Matco + Fluid
-
Axles, brakes, and...
-
Flipping the plane -...
-
Final Reinforcements
-
Landing gear cover
-
Attach Tabs and...
-
Preparing Strut
-
Main Gear Bulkhead...
-
Fabricating Wheel...
-
Brakes (Matco)
-
Main Gear Cover
-
Flipping the Plane 2x
-
Axles and wheels
-
Attach Tabs and...
-
Landing brake
-
Master Brake Cylinders
C10 Canard
- (5)
-
Elevators - purchased!
-
Canard
C11 Elevator
- (2)
-
Elevators - Pitch...
C12 Canard 2
- (2)
-
Attachment bolts
-
Canard installation
C13 Nose+Gea
- (15)
-
Nose Lift
-
Pitot heat
-
Tires
-
LIDAR
-
Piping the Pitot and...
-
Nose Gear refinement
-
Closing the Top and...
-
Installation of Box...
-
Fabricating NG-30s
-
Nose Gear
-
Installing Worm...
-
rudder pedals
-
Reinforcing Glass Strut
-
Finishing
-
Nose Door
C14 Cen Spar
- (2)
-
Center Spar -...
-
Center Section Spar
C15 Firewall
- (4)
-
Firewall pt 2
-
Fuel pump,...
-
Rudder Cable Brackets
-
Firewall Insulation...
C16 Controls
- (4)
-
Pitch and Roll Parts
-
Pitch and Roll...
-
Balance post-paint
-
Pivot Mounts
C17 Trim
- (3)
-
pitch trim, rolll...
-
Strong Pitch Trim...
C18 Canopy
- (18)
-
C18.17 Instrument Cover
-
C18.23 fresh air vents
-
repairs
-
Installing Hinges
-
Outside of Turtleback
-
Engine Mount...
-
Installing Upper...
-
Installing Upper...
-
Installing Turtleback
-
Turtleback Construction
-
Installing Windows
-
Turtleback Form
-
canopy frame
-
Canopy Hinges
-
Texas Canopy
-
Canopy, Before Cutting
-
New Gas Spring
-
Rear canopy latch
C19 Wing+Ail
- (14)
-
wing finishing &...
-
Attachment, Wing to...
-
Controls
-
Aileron Mounting
-
Top Skin
-
Top Spar Cap
-
Bottom Skin
-
Bottom Spar Cap
-
Core Assembly and...
-
Cutting Foam Cores
-
Setting up the Jigs
-
Wing Ribs
-
Building the Wing Jigs
-
Ailerons
C20 Rudders
- (1)
-
Rudders Rigged &...
C21 Strakes
- (19)
-
Fuel Level Sensing
-
Fuel lines &...
-
Fuel lines
-
Fuel Pumps
-
Fuel Valve,...
-
Fuel system
-
Fabrication of Parts
-
Sealing Fuel Tanks
-
Leading Edge and...
-
Pressure Check
-
Top Skin
-
Bottom Outside Skin...
-
End Rib and Outlet...
-
Top Skin Cores
-
Vent, Screen, and...
-
Inside Layups
-
Jigging and Assembly...
-
Fuel Tanks and...
-
Fuel Fittings
C22 Electrical
- (35)
-
Schematics
-
13. cabin side - part 1
-
06. Panel Final (?)
-
08 - back up com
-
Transponder + ELT...
-
CO detector
-
14. Firewall - cabin...
-
00. 12v, dual...
-
95. Manuals
-
97. Expansion bus
-
05 switches
-
03 Panel - drafts...
-
96. Regulator test rig
-
02 panel - patch...
-
83. Shore Power
-
15. wiring EI
-
Cabin Lights
-
05 panel - mounting...
-
98. Discarded -...
-
07 - Avionics Bus
-
82. Making cables
-
Lights: Nav, Strobe,...
-
Cabin Accessories
-
cabin heat
-
Aux Alt tray
-
04 Panel - Labels
-
01 Fitting a panel
-
02. Out with the bad
-
81. Tools & Tricks
-
99. Prior builder...
-
Securing large wires
-
Waiting for components
-
Com Antennas
C23 Eng+Cowl
- (21)
-
Starter
-
Cowling - fasteners
-
Cooling
-
Cowl #5 - oil door
-
Engine mount
-
dummy engine for the...
-
reference - torque...
-
Notes - Cautions -...
-
IO-360 sumps &...
-
Exhaust
-
cowling - Boat Tail...
-
Cowl #4
-
Cowl #3
-
Throttle Cable 2
-
Cowl #2
-
cowl
-
air filter
-
Throttle cable
-
Baffles - composite...
-
Picking an...
-
Throttle
C24 Seats+Fair
- (7)
-
Panel glare shield
-
Arm Rests
-
Cover for EZ nose lift
-
Seat Belts
-
seat cushions
-
Map Pockets
-
Thigh Supports &...
C25 Paint
- (11)
-
going with a rolled...
-
Interior paint
-
Prime & top coat
-
Nobody Will See...
-
N number
-
sample - inside of...
-
Looking towards...
-
Dump & Run ,...
-
Dump & Run,...
-
Sanding overview -...
-
parts after epoxy wipe
C99 to sort
- (5)
-
Oxygen
-
Gap Seals
-
stations for CG...
-
Wing Intersection Trim
-
Fuselage together
D01Engine&Prop
- (1)
-
Mounting the prop
E01 Next Steps
- (4)
-
fuel capacity and...
-
Ballast
-
Test cards
-
Certification
Z-Tools+Tips
- (11)
-
gap tape
-
Sewing machine
-
Safety
-
Shop-made parts -...
-
04 Band Saw Fence
-
07 Repairing Seals...
-
06 Jack stand
-
05 Hot wiring foam
-
03 Fiberfrax...
-
02 Piano hinge lube
-
02 Wing Trolley
Inspection
Interior Finish
Trim & A/P
Turtleback
E1- Inspect
Builder Name:
Preston Kavanagh
-
Project:
Cozy - Mark IV
-
VIEW REPORTS
Total Hours:
4433.6
Total Flight Time:
Total Expense:
$33393.25
Start/Last Date:
Sep 01, 2003 - No Finish Date
Engine:
IO-360-A3B6D
Propeller:
Hertzler Silver Bullet 66 x 78
Panel:
Garmin G3X + ipad
Friendly URL:
https://eaabuilderslog.org?s=Cozy4
Home or Last Project Picture
No Entries found
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.